Buildfix Constructing Helifix Display Walls For The Up & Coming Design Build Expo

September 18, 2014

 

Example of a three metre cavity wall constructed. One wall with the Helibeam system and the other without. During the exhibition a demonstration will show the difference in strength with each wall resting only 100mm on either side. [For the record, the wall with the Helibeam installed took the weight of three men standing in the centre and the wall without collapsed under its own weight. 

 

 The demo wall for the expo complete. 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

End Terrace Gable Restoration, Rozelle

April 6, 2016

1/4
Please reload

Recent Posts

September 11, 2015

Please reload

Archive